Sockets, heating and lights
Extra sockets, lighting and a proper supply for a heater that runs for hours.
Additions around the houseLocks Heath & Titchfield Common
Electrical work in Locks Heath and Titchfield Common — faults, sockets and lighting, fuse boards, inspections and rewiring.
Services
Extra sockets, lighting and a proper supply for a heater that runs for hours.
Additions around the houseA breaker that trips on cold evenings when the heater and the kettle are both on.
Finding the causeAn older board with more on it than it started with, and whether it is time for a new one.
Replacing a consumer unitThe real condition of circuits that were lengthened for a conservatory or a kitchen.
Having it inspectedWhatever has prompted the call, it is probably on this list. A circuit that trips. A socket or light that has stopped working. Switches and fittings to replace, or an extractor fan. A fuse board that belongs to another era, or an inspection before a house is sold, bought or let. I add circuits for kitchens, showers and car chargers, put power and lighting outside, and rewire in part or in full where a house needs it. Landlords get the certificate and any remedial work in one go.
Most of Locks Heath is housing from the 1970s onwards, and Titchfield Common next to it is much the same. These are houses that have had a board, a kitchen or a back room changed along the way, and that is where most of the questions come from. Prices are agreed before work starts, and quoting is free.
A common one locally: a conservatory that has become an everyday room while its electrics stayed as they were — a socket or two off the ring in the old back wall, a plug-in heater running for hours, extension leads for the lamps. A heater running that long is better on a supply meant for it, and extra sockets should come from a sound circuit rather than the nearest one.
Outdoor jobs come up often: a weatherproof socket, lighting along a path or drive, power for a shed or a hot tub. They need proper protection and fittings made for the weather, not indoor ones moved outside. A garage, workshop or garden office normally wants its own circuit, sized for the distance rather than spurred off whatever is nearest.
If you’re extending or converting the loft, it’s far easier to wire while the walls are still open, with the socket and lighting positions agreed before the rest of the work moves on. It’s also the right moment to check the board has room for the new circuits, including a car charger if one is likely later.
Plenty of people ask first, and it’s the right thing to do. Tell me what you’ve got and I’ll explain what the job really needs, what’s optional, and what each would cost. 15 years in, I’d rather do that than reach for the biggest option. Quotes are free and nothing starts until you’re happy. Let’s have a chat.
Coverage
Questions
Yes, and if the room is used all year it is worth doing. A wall heater wired to its own supply is a better arrangement than a plug-in heater running for hours from a socket that was only ever meant for a lamp.
Describe the job, and how the room is used if it is the conservatory, and I will come back to you.