Shower circuits
A replacement shower, or the heavier supply a more powerful one needs.
Showers and circuitsPark Gate
Electrical work in Park Gate — faults and repairs, sockets and lighting, fuse boards, inspections and shower circuits.
Services
A replacement shower, or the heavier supply a more powerful one needs.
Showers and circuitsA shower that stops mid-wash, or trips the power whenever it runs.
Finding what is wrongMatching protection for a heavier shower cable, which older boards may lack.
Boards and protectionChecking an installation that has been updated a room at a time.
Inspections explainedPark Gate stretches along the A27 and the roads either side of it, between Sarisbury and Whiteley, and all of it is covered. The work is the everyday sort. Tracking down the cause when a breaker trips or a socket dies. Replacing worn sockets, switches and fittings, and fitting extractor fans. Changing old fuse boards for consumer units with modern protection. And inspections — an EICR before a sale, or the certificate a rented home needs. Extra circuits and rewiring follow from there.
A lot of the housing here dates from the 1930s to the 1960s, so circuits have usually been altered along the way. That is a reason to test before quoting, which is exactly what happens: a look first, then a price, then the work, with a certificate at the end. Quotes cost nothing.
A frequent job in bathrooms of that age. A shower runs on a circuit of its own, so a like-for-like replacement is straightforward if that circuit is sound, while a more powerful unit usually needs a heavier cable and matching protection. Scorch marks or warmth at the pull-cord switch, a burning smell, or a breaker tripping mid-shower all mean stop and have it checked.
Outdoor jobs are steady: a weatherproof socket, lighting down a path or drive, power for a shed or hot tub. Everything outside needs RCD protection and fittings made for it. A garage, workshop or garden office normally needs a circuit of its own rather than a lead through a window, sized for the distance and the load.
Extensions and loft conversions are easier and cheaper wired before the walls are closed up, with the positions agreed before the rest of the work moves on. It’s also the natural moment to check the board has room for the new circuits, and for an EV charge point if that’s somewhere on the list.
If you don’t know whether something needs replacing or just repairing, ask. Most calls are quicker to sort out by talking it through first. After 15 years I can tell you what’s urgent, what’s sensible, and what can be left for now. The quote is free. Let’s have a chat.
Coverage
Questions
Usually not. The cable was sized for the shower that is there now, and a higher rating normally needs a heavier one with matching protection. Tell me the rating of both and I can say what is involved.
No. Warmth or discolouration at that switch usually means a poor connection or a circuit working too hard. Stop using the shower and have it checked before it is used again.
Tell me what is fitted and what you want instead, and I will come back to you.