Additions
The sockets, outside points and circuits the original build did not include.
Adding to an installationHedge End
Electrical work in Hedge End — faults and repairs, sockets and lighting, consumer units, inspections and new circuits.
Services
The sockets, outside points and circuits the original build did not include.
Adding to an installationTripping or dead circuits, whatever the age of the house.
Tracking down faultsA snapshot of an older house on one of the village roads.
Inspections explainedA board that has been added to once too often.
Replacing a boardWhatever the house, the list is much the same. Tracing a fault when a circuit keeps tripping or a room has lost power. Replacing sockets, switches and light fittings. Consumer unit changes where the board is old or overloaded. And inspection and testing — an EICR before you buy or sell, and the certificate a rented property needs. On top of that, the additions: outside sockets and lights, extra circuits for a kitchen appliance, a shower or a charge point, and rewiring where an older house needs it.
I do the work myself, quote before I start, and give you the certificate that records the testing. There is no charge for coming to look and no obligation afterwards.
Much of Hedge End has been built over the last few decades around an older village centre, and the two make for different jobs. On the newer houses the wiring itself is rarely the problem. What comes up is whatever the original specification left out: too few sockets in a bedroom, nothing outside, a kitchen designed before anyone wanted an induction hob or a charger by the back door. The original village roads have older houses among the newer ones, with boards that have been changed once or twice and circuits extended over the years. Say which kind of house yours is when you get in touch.
Newer homes usually come with a warranty, and in the first couple of years defects are normally the developer’s to put right. If something electrical is wrong in that period, report it to them first — a repair by somebody else can complicate things. If they have looked at it and you are not satisfied, or you want an independent opinion, I am happy to come and see.
If you’re extending, converting the loft or turning the garage into a room, it’s much cheaper to sort the electrics early. We agree where the sockets and switches go before the plasterboard goes up, the new circuits are run while the walls are still open, and I check whether your existing board can carry them. Leave it until later and it usually means work being undone. A garden office or detached garage is the same job a few metres further out, on its own protected circuit sized for the distance.
Mention a car charger at the same time if one is likely. An EV charge point runs on its own circuit, so your board and incoming supply decide what’s possible, and it’s far easier to sort before a drive is relaid or a garage is converted.
You don’t need to know the technical answer before you ring. Tell me what you’re planning and I’ll explain what’s involved. After 15 years I can usually tell you what to sort now, what will happily wait a year, and what would just be money wasted. I’ll price the options and leave you to choose. Let’s have a chat.
Questions
The builder first. New homes usually come with a warranty under which the developer puts defects right in the early years. If they have looked and you want an independent view, I am happy to come out.
Yes. It needs its own protection and a weatherproof fitting, and if the route through the wall is straightforward it is usually a short job.
Tell me what you want and whether the house is new, and I will come back to you.