Consumer units
Main and off-peak boards, and whether they have room for what is coming.
Boards and upgradesRingwood & BH24
Electrical work in Ringwood, Poulner, St Leonards and Burley — repairs, fuse boards, inspections and new circuits.
Services
Main and off-peak boards, and whether they have room for what is coming.
Boards and upgradesHeaters that no longer charge, or a supply that trips overnight.
Finding faultsNew supplies for heating, hot water or anything else that needs a circuit of its own.
Circuits and additionsSeeing what an electrically heated home is really carrying.
Inspecting an installationOrdinary jobs make up most of the work: finding a fault behind a circuit that trips, dead sockets and lighting, worn switches and fittings, extractor fans, and replacing a fuse box with a consumer unit that has proper RCD protection. Inspections too — an EICR for a sale or a tenancy, and the certificates landlords need. Additions are frequent: an outside socket, garden lighting, a cooker or shower circuit, a charge point on the drive, and rewiring where an older house has come to it.
You get one electrician for the whole job, NAPIT registered and fully insured, with the price agreed before anything starts. Quotes are free.
Ringwood is in Hampshire, on the western edge of the New Forest, but its postcode is BH24 — the same letters as Bournemouth. Now and then that leaves people unsure whether an electrician from the Hampshire side covers it. I do: Ringwood and Poulner, and the BH24 places either side of the county line, from St Leonards and St Ives to Burley. The A31 makes it an easy drive from Eastleigh.
Not every property around here is on mains gas, and where heating and hot water run on electricity the installation carries far more load. Storage heaters and an immersion on an off-peak tariff usually mean a second, time-controlled supply alongside the normal one — often a small separate board, or an unlabelled switch near the meter. Replacing storage heaters, changing tariff or having a heat pump fitted all change what the board and the incoming supply are asked to do. The heating is the installer’s side; whether the electrics can take it is mine.
If you’re extending, converting a loft or fitting out a garage or garden office, the wiring is cheaper and tidier planned early. The circuits go in while everything is still open, we agree the positions before the plastering, and I check the board for spare ways and protection. A building away from the house needs its own supply, sized for the distance rather than borrowed from the nearest socket.
If the heating is electric, or you’re thinking about a charge point, it’s worth adding the loads up first. A charger, a shower and storage heating are each fine on their own. Together they can ask more of the supply than it was built for. That’s down to your board and the incoming supply rather than the appliance itself.
Ring and describe it in your own words. After 15 years it doesn’t take long to work out whether you’re looking at a repair, an upgrade or a bigger piece of work, and to tell you straight which parts can be left for now. The quote is free. Let’s have a chat.
Coverage
Questions
Usually storage heaters, an immersion heater or both, set to use cheaper overnight electricity. If you have changed tariff since it was set up, it is worth checking that it still switches when you think it does.
Often, but not always. The heating installer will say what supply the heat pump needs. I can check whether the board and the incoming supply have room for it, and where they do not, the network operator may need to be involved before it goes in.
Tell me what it is and how the house is heated, and I will come back to you.